The modules will be reassembled on the Verne Global campus upon arrival, making it the first wholesale data center space in Iceland, and also the world’s first zero-emission data center powered by dual-sourced renewable energy.
“This will be one of the biggest logistical challenges in the data center industry, with 37 modules being delivered in total,” explained Bernard Geoghegan, Executive Vice President of Colt Data Center Services.
The data center’s location has been strategically placed so that it will be the first in the world to use 100% dual sourced renewable energy sources – a mixture of geothermal and hydro-electric power. In addition to this, the cooling system has been optimised to suit Iceland’s climate, allowing for free cooling 365 days a year.
Geoghegan added, “By the end of this year, Verne Global will be open for business with a prime quality, flexible data center in a shorter time than a traditional build would allow.”
In addition, Verne Global last week announced that it has signed its first contract – a joint agreement with the U.S. based company Datapipe – to deliver carbon neutral managed IT solutions.
For further information about the location of the green data center, visit http://asbru.is/english.
Reykjavik, Iceland, 15.01.2025 - Designing a website for a tourism company can often feel expensive…
This December, Kunsthallen Street Art Norge invites art lovers, tech enthusiasts, and the curious to…
Reykjavik, Iceland, November 25, 2024 – Rising Icelandic band Dóra & Döðlurnar, led by the…
London, UK, 25.11.2024 - Emerging artist Janeema has released her latest single, “Drowning,” a genre-defying…
Lagos, Nigeria, 25.11.2024 - In a music industry teeming with talent, a fresh voice is…
LONDON, UK – 21.11.2024 – Rebura, an award-winning AWS (Amazon Web Services) specialist consultancy and…